Simplot-Rainier Plant 30-day Public Comment Period Sept. 18 - Oct. 23, 2023
Para asistencia en español: preguntas@ecy.wa.gov
This is a 30-day public comment period for the review of Simplot U.S. Food Group Holdings, LLC - Rainier Plant's (Simplot-Rainier) draft permit, technical support document, and notice of construction application with associated documents.
Simplot Rainier is proposing to construct a new potato processing facility located at 2107 Road O NE, in Moses Lake. Simplot - Rainier plans to install a wet electrostatic precipitator to control particulate matter from fryer equipment and sulfur controls for the biogas produced from their process water digester. Emission increases from this project include:
33.6 tons per year of nitrogen oxides
56.3 tons per year carbon monoxide
17.6 tons per year particulate matter
89.8 tons per year volatile organic compounds
We determined this proposal satisfies the requirements of Chapter 173-400 WAC. The public is invited to comment.
Join us for a public hearing:
Thursday, October 19, 2023, at 5:00 p.m.
Wingate by Wyndham Moses Lake
1735 E. Kittleson Road
Moses Lake, WA 98837
View project documents online.
Comment period ends October 23, 2023.
Contact Information
All fields are optional unless otherwise indicated.
Thank you for subscribing to the Simplot-Rainier Plant 30-day Public Comment Period Sept. 18 - Oct. 23, 2023 mailing list.
Para asistencia en español: preguntas@ecy.wa.gov
This is a 30-day public comment period for the review of Simplot U.S. Food Group Holdings, LLC - Rainier Plant's (Simplot-Rainier) draft permit, technical support document, and notice of construction application with associated documents.
Simplot Rainier is proposing to construct a new potato processing facility located at 2107 Road O NE, in Moses Lake. Simplot - Rainier plans to install a wet electrostatic precipitator to control particulate matter from fryer equipment and sulfur controls for the biogas produced from their process water digester. Emission increases from this project include:
We determined this proposal satisfies the requirements of Chapter 173-400 WAC. The public is invited to comment.
Join us for a public hearing:
Thursday, October 19, 2023, at 5:00 p.m.
Wingate by Wyndham Moses Lake
1735 E. Kittleson Road
Moses Lake, WA 98837
View project documents online.
Comment period ends October 23, 2023.
Contact Information
All fields are optional unless otherwise indicated.